Toyota Yaris: Engine & Hybrid System / G16e-gts (starting)
INSTALLATION PROCEDURE 1. INSTALL TIMING CHAIN COVER OIL SEAL Click here
2. INSTALL TIMING CHAIN COVER ASSEMBLY (a) Install 2 new O-rings to the cylinder block sub-assembly...
ComponentsCOMPONENTS ILLUSTRATION
*1 CENTER LOWER INSTRUMENT COVER *2 LOWER INSTRUMENT PANEL FINISH PANEL *3 ENGINE SWITCH - - RemovalREMOVAL PROCEDURE 1...
Other information:
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the engine assembly removal/installation are shown below...
INSTALLATION PROCEDURE 1. INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY (a) Install the floor shift shift lever assembly to the vehicle body with the 4 bolts. Torque: 12 N·m {122 kgf·cm, 9 ft·lbf} (b) Engage the 4 clamps to connect the wire harness to the floor shift shift lever assembly...
Categories

Smart key
Auxiliary key
Key code number plate
To use the auxiliary key, press the knob and pull out the auxiliary key
from the smart key.

read more