Toyota Yaris: Engine & Hybrid System / G16e-gts (lubrication)
INSTALLATION PROCEDURE 1. INSTALL STUD BOLT (a) Using an E8 "TORX" socket wrench, install the stud bolt to the turbocharger sub-assembly. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} 2...
ComponentsCOMPONENTS ILLUSTRATION
*1 OIL COOLER ASSEMBLY *2 OIL COOLER GASKET *3 NO. 5 WATER BY-PASS HOSE *4 OIL FILLER CAP ASSEMBLY *5 GASKET *6 OIL PAN DRAIN PLUG *7 NO...
Other information:
REMOVAL PROCEDURE 1. DISCONNECT NO. 1 ROOF HEADLINING MOULDING LH Click here
2. DISCONNECT NO. 1 ROOF HEADLINING MOULDING RH HINT: Use the same procedure as for the LH side. 3. REMOVE FRONT PILLAR GARNISH LH Click here
4. REMOVE FRONT PILLAR GARNISH RH HINT: Use the same procedure as for the LH side...
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the front stabilizer bar removal/installation are shown below...
Categories
No special break-in is necessary, but a few precautions in the first 600
miles (1,000 km) may add to the performance, economy, and life of
the vehicle.
Do not race the engine.
Do not maintain one constant speed, either slow or fast, for a long
period of time.
Do not drive constantly at full-throttle or high engine rpm for
extended periods of time.
Avoid unnecessary hard stops.
Avoid full-throttle starts.
read more