Toyota Yaris: Engine & Hybrid System / G16e-gts (lubrication)
INSTALLATION PROCEDURE 1. INSTALL STUD BOLT (a) Using an E8 "TORX" socket wrench, install the stud bolt to the turbocharger sub-assembly. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} 2...
ComponentsCOMPONENTS ILLUSTRATION
*1 OIL COOLER ASSEMBLY *2 OIL COOLER GASKET *3 NO. 5 WATER BY-PASS HOSE *4 OIL FILLER CAP ASSEMBLY *5 GASKET *6 OIL PAN DRAIN PLUG *7 NO...
Other information:
INSTALLATION PROCEDURE 1. INSTALL BACK DOOR OUTSIDE GARNISH SUB-ASSEMBLY (a) Engage the clips to install the back door outside garnish sub-assembly as shown in the illustration.
Install in this Direction (1)
Install in this Direction (2) (b) Install the 4 bolts...
INSTALLATION CAUTION / NOTICE / HINT CAUTION: Wear protective gloves. Sharp areas on the parts may injure your hands. HINT:
Use the same procedure for the driver side and front passenger side.
The procedure listed below is for the driver side.
PROCEDURE 1...
Categories
No special break-in is necessary, but a few precautions in the first 600
miles (1,000 km) may add to the performance, economy, and life of
the vehicle.
Do not race the engine.
Do not maintain one constant speed, either slow or fast, for a long
period of time.
Do not drive constantly at full-throttle or high engine rpm for
extended periods of time.
Avoid unnecessary hard stops.
Avoid full-throttle starts.
read more