Toyota Yaris: G16e-gts (fuel) / Fuel Injector (for Port Injection)
INSTALLATION CAUTION / NOTICE / HINT NOTICE: This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts...
COMPONENTS ILLUSTRATION
*1 PORT FUEL INJECTOR ASSEMBLY *2 NO. 5 ENGINE WIRE *3 INJECTOR VIBRATION INSULATOR *4 FUEL DELIVERY SPACER *5 FUEL DELIVERY PIPE *6 FUEL DELIVERY GUARD *7 OIL LEVEL GAUGE GUIDE *8 OIL LEVEL GAUGE SUB-ASSEMBLY *9 NO...
Other information:
INSTALLATION PROCEDURE 1. INSTALL BRAKE MASTER CYLINDER O-RING (a) Install a new brake master cylinder O-ring to the brake master cylinder sub-assembly. 2. INSTALL BRAKE MASTER CYLINDER SUB-ASSEMBLY NOTICE: When installing a new brake master cylinder sub-assembly, remove the protectors from the master cylinder piston and outlet ports...
INSPECTION PROCEDURE 1. INSPECT REAR SHOCK ABSORBER ASSEMBLY (a) Compress and extend the rear shock absorber rod 4 times or more. Standard: When compressed and extended at a constant speed, the stroke of the shock absorber rod is smooth with no abnormal resistance or sounds...
Categories
The front seat belt pretensioners are designed to deploy in moderate or
severe frontal, near frontal collisions.
In addition, the pretensioners operate when a side collision or a rollover
accident is detected. The pretensioners operate differently
depending on what types of air bags are equipped. For more details
about the seat belt pretensioner operation, refer to the SRS Air Bag
Deployment Criteria.
read more