Toyota Yaris: Ignition System / Parts Location
PARTS LOCATION
ILLUSTRATION
| *1 | ECM | *2 | IGNITION COIL ASSEMBLY |
| *3 | SPARK PLUG | *4 | NO. 1 ENGINE ROOM RELAY BLOCK - IGP RELAY - IGP-MAIN FUSE - INJ FUSE |
| *5 | FUSIBLE LINK BLOCK ASSEMBLY - R/B FR FUSE | - | - |
Other information:
INSPECTION PROCEDURE 1. INSPECT WINDSHIELD WIPER SWITCH ASSEMBLY (a) Check the resistance. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance: Front Wiper Switch Tester Connection Condition Specified Condition z5-14 (MIST) -z5-5 (E) MIST position Below 1 Ω z5-14 (MIST) -z5-5 (E) Except MIST position 10 kΩ or higher z5-10 (W_OFF) - z5-5 (E) OFF position Below 1 Ω z5-10 (W_OFF) - z5-5 (E) Except OFF position 10 kΩ or higher z5-13 (+S) - z5-5 (E) AUTO position Below 1 Ω z5-13 (+S) - z5-5 (E) Except AUTO position 10 kΩ or higher z5-11 (+1) - z5-5 (E) LO position Below 1 Ω z5-11 (+1) - z5-5 (E) Except LO position 10 kΩ or higher z5-12 (+2) - z5-5 (E) HI position Below 1 Ω z5-12 (+2) - z5-5 (E) Except HI position 10 kΩ or higher Front Washer Switch Tester Connection Condition Specified Condition z5-15 (WF) - z5-5 (E) ON position Below 1 Ω z5-15 (WF) - z5-5 (E) OFF position 10 kΩ or higher Auto Sensitivity Adjustment Switch Tester Connection Condition Specified Condition z5-4 (VR) - z5-5 (E) P1 position 1102 to 1218 Ω z5-4 (VR) - z5-5 (E) P2 position 570 to 630 Ω z5-4 (VR) - z5-5 (E) P3 position 256...
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during the power steering ECU assembly removal/installation are shown below...
Categories
Before refueling, close all the doors, windows, and the liftgate/trunk
lid, and switch the ignition OFF.
To open the fuel-filler lid, pull
the remote fuel-filler lid release.

To remove the fuel-filler cap, turn it counterclockwise.
Attach the removed cap to the
inner side of the fuel-filler lid.
read more