Toyota Yaris: Maintenance / G16e-gts Coolant
INSTALLATION PROCEDURE 1. INSTALL AUXILIARY BATTERY (a) Install the auxiliary battery. (b) Install the battery clamp sub-assembly to the body with the nut and bolt...
COMPONENTS ILLUSTRATION
*1 RESERVE TANK CAP *2 RADIATOR DRAIN COCK PLUG *3 NO. 1 ENGINE UNDER COVER ASSEMBLY - -
N*m (kgf*cm, ft...
Other information:
PrecautionPRECAUTION NOTICE OF REMOVING AND INSTALLING FRONT DRIVE SHAFT ASSEMBLY RH (a) When removing and installing the front drive shaft assembly RH, be sure to first drain all the transaxle oil and transfer oil. If removal and installation are carried out without draining these oils, the transfer oil will flow into the transaxle side...
DESCRIPTION The air conditioning harness assembly and No. 1 air conditioning radiator damper servo sub-assembly connect the air conditioning amplifier assembly and the No. 1 blower damper servo sub-assembly. The air conditioning amplifier assembly supplies power and sends operation instructions to No...
Обмен рубли на usdt онлайн. Онлаи обмен рубль rub на tether trc20 usdt
multikassa.com.
Categories
The fuel gauge shows approximately how much fuel is remaining in
the tank when the ignition is switched ON. We recommend keeping
the tank over 1/4 full.

Full
1/4 Full
Empty
read more