Toyota Yaris: Heating / Air Conditioning / Compressor
INSTALLATION CAUTION / NOTICE / HINT PROCEDURE 1. INSTALL BLOWER ASSEMBLY (a) Engage the claws to install the blower assembly.
(b) Install the 3 screws...
COMPONENTS ILLUSTRATION
*1 NO. 1 ENGINE UNDER COVER ASSEMBLY *2 SUCTION HOSE SUB-ASSEMBLY *3 NO. 1 COOLER REFRIGERANT DISCHARGE HOSE *4 COMPRESSOR WITH PULLEY ASSEMBLY *5 O-ring - -
Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping" : N*m (kgf*cm, ft...
Other information:
DESCRIPTION The waste gate valve is built into the turbine housing and is operated by the vacuum regulating valve assembly. The ECM uses duty control to open and close the vacuum regulating valve assembly. The amount of opening is controlled according to the operation status...
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the mass air flow meter removal/installation are shown below...
Categories
Stop the vehicle completely.
Manual transaxle:
Shift into neutral and set the parking brake.
Automatic transaxle:
Shift the selector lever to the P position and set the parking brake.
Press the push button start to turn off the engine. The ignition position is
off.
read more