Toyota Yaris: G16e-gts (intake / Exhaust) / Intake System
INSTALLATION PROCEDURE 1. INSTALL MANIFOLD TO CYLINDER HEAD GASKET (a) Install a new No. 1 intake manifold to head gasket to the intake manifold. 2. INSTALL THROTTLE WITH THROTTLE POSITION SENSOR BODY ASSEMBLY (a) Install the new gaskets to throttle with throttle position sensor body assembly...
ON-VEHICLE INSPECTION CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced when repairing air leaks in the intake system are shown below...
Other information:
CAUTION / NOTICE / HINT HINT:
Use the following procedure to troubleshoot the air conditioning system.
*: Use the GTS.
PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP
NEXT
2. CUSTOMER PROBLEM ANALYSIS HINT:
In troubleshooting, confirm that the problem symptoms have been accurately identified...
ADJUSTMENT PROCEDURE 1. PREPARE VEHICLE FOR HEADLIGHT AIM ADJUSTMENT (a) Prepare the vehicle:
Ensure that the vehicle body is not damaged or deformed around the headlights.
Fill the fuel tank.
Make sure that the oil is filled to the specified level...
Categories
No special break-in is necessary, but a few precautions in the first 600
miles (1,000 km) may add to the performance, economy, and life of
the vehicle.
Do not race the engine.
Do not maintain one constant speed, either slow or fast, for a long
period of time.
Do not drive constantly at full-throttle or high engine rpm for
extended periods of time.
Avoid unnecessary hard stops.
Avoid full-throttle starts.
read more